RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2510028299 - Archived data from Tue, 11. August 2020 17:31:39 CEST


This is all the information about APD 2510028299. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2510028299
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2510028299/2320025880
Unit: #1267 (barcode 1309013388)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 7.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 172
Position in Box: 29
EP1 batch: 27
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.9895923 V     T = -25 °C: 346.6218559 V
Voltage for Gain 150: T = +20 °C: 389.8699401 V     T = -25 °C: 354.0119582 V
Voltage for Gain 200: T = +20 °C: 394.236577 V     T = -25 °C: 358.1547068 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.637552722 V-1     T = -25 °C: 4.679283077 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.223523574 V-1     T = -25 °C: 9.597110159 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.38102033 V-1     T = -25 °C: 15.34323122 V-1
Break-through voltage: T = +20 °C: 410.2839632 V     T = -25 °C: 373.8333371 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:29 CET jreher Updated box and position via API.
11. Aug 2020 17:31:39 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:25:58 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:34 CET jreher Updated box and position via API.
27. Nov 2019 19:59:21 CET jreher Updated APD location via API.
25. Nov 2019 17:24:27 CET jreher Updated box and position via API.
30. Jul 2019 15:17:57 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:05:16 CEST markus.moritz
05. Jul 2019 13:59:01 CEST jreher Updated APD location via API.
24. Jun 2019 16:16:06 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:18 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:05 CET Tobias Imported from Hamamatsu datasheet.