RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2509028230 - Archived data from Tue, 11. August 2020 17:31:30 CEST


This is all the information about APD 2509028230. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2509028230
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.6 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 171
Position in Box: 20
EP1 batch: 25
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.0058041 V     T = -25 °C: 353.1697921 V
Voltage for Gain 150: T = +20 °C: 396.9065811 V     T = -25 °C: 360.7233332 V
Voltage for Gain 200: T = +20 °C: 401.2709228 V     T = -25 °C: 364.9270086 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.606472728 V-1     T = -25 °C: 4.762741344 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.160957229 V-1     T = -25 °C: 8.825033631 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.4278577 V-1     T = -25 °C: 15.58119028 V-1
Break-through voltage: T = +20 °C: 416.2591652 V     T = -25 °C: 380.0140817 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:45:43 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:15:49 CEST oafedulidis Updated box and position via API.
03. May 2021 10:25:22 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:22 CET jreher Updated box and position via API.
11. Aug 2020 17:31:30 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:10 CET jreher Updated APD location via API.
25. Nov 2019 17:24:22 CET jreher Updated box and position via API.
30. Jul 2019 15:17:29 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:41:12 CEST markus.moritz
05. Jul 2019 13:58:52 CEST jreher Updated APD location via API.
24. Jun 2019 14:47:03 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:16 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:04 CET Tobias Imported from Hamamatsu datasheet.