RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2509028184 - Archived data from Fri, 05. February 2021 11:10:15 CET


This is all the information about APD 2509028184. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2509028184
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 8.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 170
Position in Box: 33
EP1 batch: 24
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1663286 V     T = -25 °C: 345.5788029 V
Voltage for Gain 150: T = +20 °C: 388.9574894 V     T = -25 °C: 352.9615386 V
Voltage for Gain 200: T = +20 °C: 393.2671983 V     T = -25 °C: 357.1051476 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.719886125 V-1     T = -25 °C: 4.785653451 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.478412161 V-1     T = -25 °C: 9.939589788 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.07910966 V-1     T = -25 °C: 16.07141421 V-1
Break-through voltage: T = +20 °C: 408.9497355 V     T = -25 °C: 372.6168829 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:22:17 CET jreher Assigned to capsule by script
05. Feb 2021 11:10:15 CET jreher Updated box and position via API.
18. Dec 2020 14:00:19 CET jreher Updated box and position via API.
11. Aug 2020 17:31:21 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:00 CET jreher Updated APD location via API.
25. Nov 2019 17:24:18 CET jreher Updated box and position via API.
30. Jul 2019 15:17:15 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:18:30 CEST markus.moritz
05. Jul 2019 13:58:44 CEST jreher Updated APD location via API.
24. Jun 2019 14:01:30 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:15 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:03 CET Tobias Imported from Hamamatsu datasheet.