RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2508028136 - Archived data from Tue, 06. October 2020 16:53:09 CEST


This is all the information about APD 2508028136. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2508028136
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 169
Position in Box: 41
EP1 batch: 23
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5363721 V     T = -25 °C: 349.6295046 V
Voltage for Gain 150: T = +20 °C: 392.512322 V     T = -25 °C: 357.0851475 V
Voltage for Gain 200: T = +20 °C: 396.9597397 V     T = -25 °C: 361.2616573 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.443671333 V-1     T = -25 °C: 4.810388046 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.775834826 V-1     T = -25 °C: 9.61354078 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.30060223 V-1     T = -25 °C: 15.70719331 V-1
Break-through voltage: T = +20 °C: 411.0002763 V     T = -25 °C: 376.7142135 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:07 CET jreher Updated box and position via API.
08. Dec 2020 17:17:52 CET jreher Assigned to capsule by script
06. Oct 2020 16:53:09 CEST jreher Updated box and position via API.
11. Aug 2020 17:31:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:49 CET jreher Updated APD location via API.
25. Nov 2019 17:24:14 CET jreher Updated box and position via API.
30. Jul 2019 15:16:05 CEST spankonin Updated APD batch assignment via API.
19. Jul 2019 09:53:55 CEST markus.moritz
05. Jul 2019 13:58:37 CEST jreher Updated APD location via API.
24. Jun 2019 13:56:24 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:13 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:02 CET Tobias Imported from Hamamatsu datasheet.