RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2508028089 - Archived data from Fri, 05. February 2021 11:10:04 CET


This is all the information about APD 2508028089. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2508028089
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 8.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 169
Position in Box: 12
EP1 batch: 22
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3341726 V     T = -25 °C: 349.1184916 V
Voltage for Gain 150: T = +20 °C: 392.2382829 V     T = -25 °C: 356.515184 V
Voltage for Gain 200: T = +20 °C: 396.6310336 V     T = -25 °C: 360.6563267 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.562927686 V-1     T = -25 °C: 5.048943345 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.017732945 V-1     T = -25 °C: 9.32024527 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.19156226 V-1     T = -25 °C: 14.99220519 V-1
Break-through voltage: T = +20 °C: 411.8370128 V     T = -25 °C: 375.4776883 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:28:31 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:04 CET jreher Updated box and position via API.
11. Aug 2020 17:31:09 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:47 CET jreher Updated APD location via API.
25. Nov 2019 17:24:12 CET jreher Updated box and position via API.
30. Jul 2019 15:16:03 CEST spankonin Updated APD batch assignment via API.
19. Jul 2019 09:33:24 CEST markus.moritz
05. Jul 2019 13:58:35 CEST jreher Updated APD location via API.
24. Jun 2019 13:38:17 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:12 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:02 CET Tobias Imported from Hamamatsu datasheet.