RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027976 - Archived data from Wed, 16. June 2021 15:52:13 CEST


This is all the information about APD 2505027976. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027976
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 177
Position in Box: 33
EP1 batch: 19
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3331882 V     T = -25 °C: 343.6958166 V
Voltage for Gain 150: T = +20 °C: 386.1568476 V     T = -25 °C: 350.9255756 V
Voltage for Gain 200: T = +20 °C: 390.51281 V     T = -25 °C: 354.9734325 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.560026649 V-1     T = -25 °C: 4.863101841 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.214652197 V-1     T = -25 °C: 10.16257066 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.44648432 V-1     T = -25 °C: 16.82639702 V-1
Break-through voltage: T = +20 °C: 406.4213126 V     T = -25 °C: 370.2524051 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:39:13 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:11 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:36 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:13 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:08 CET jreher Updated box and position via API.
11. Aug 2020 17:29:58 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:17 CET jreher Updated APD location via API.
25. Nov 2019 17:24:51 CET jreher Updated box and position via API.
18. Jul 2019 10:26:29 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 15:33:51 CEST markus.moritz
05. Jul 2019 14:50:15 CEST jreher Updated APD location via API.
24. Jun 2019 13:18:07 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:10 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:01 CET Tobias Imported from Hamamatsu datasheet.