RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027918 - Archived data from Tue, 11. August 2020 17:29:47 CEST


This is all the information about APD 2505027918. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027918
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.5 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 176
Position in Box: 26
EP1 batch: 17
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6061339 V     T = -25 °C: 343.804703 V
Voltage for Gain 150: T = +20 °C: 386.4189998 V     T = -25 °C: 351.0634552 V
Voltage for Gain 200: T = +20 °C: 390.794726 V     T = -25 °C: 355.1282345 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.499459603 V-1     T = -25 °C: 4.816850803 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.858714659 V-1     T = -25 °C: 9.981205997 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.9326256 V-1     T = -25 °C: 16.45745094 V-1
Break-through voltage: T = +20 °C: 406.4051343 V     T = -25 °C: 369.8944481 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:32:24 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:52 CEST jreher Updated box and position via API.
05. Feb 2021 11:11:00 CET jreher Updated box and position via API.
11. Aug 2020 17:29:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:05 CET jreher Updated APD location via API.
25. Nov 2019 17:24:45 CET jreher Updated box and position via API.
18. Jul 2019 10:27:20 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 13:16:38 CEST markus.moritz
05. Jul 2019 14:50:06 CEST jreher Updated APD location via API.
24. Jun 2019 13:05:56 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:08 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.