RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027860 - Archived data from Tue, 11. August 2020 17:29:38 CEST


This is all the information about APD 2504027860. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027860
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 175
Position in Box: 31
EP1 batch: 16
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3279663 V     T = -25 °C: 349.5392918 V
Voltage for Gain 150: T = +20 °C: 392.3156234 V     T = -25 °C: 356.9099261 V
Voltage for Gain 200: T = +20 °C: 396.7777856 V     T = -25 °C: 361.0385377 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.533988548 V-1     T = -25 °C: 4.802735759 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.045398741 V-1     T = -25 °C: 8.971712732 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.72142257 V-1     T = -25 °C: 16.23783919 V-1
Break-through voltage: T = +20 °C: 412.8069322 V     T = -25 °C: 376.3311991 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:06 CEST jreher Updated box and position via API.
14. Apr 2021 18:46:25 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:10:52 CET jreher Updated box and position via API.
11. Aug 2020 17:29:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:55 CET jreher Updated APD location via API.
25. Nov 2019 17:24:41 CET jreher Updated box and position via API.
03. Sep 2019 11:31:35 CEST jgrochowski Updated APD batch assignment via API.
18. Jul 2019 10:28:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:59 CEST jreher Updated APD location via API.
21. Jun 2019 15:50:45 CEST jgrochowski Updated APD batch assignment via API.
01. Apr 2019 11:24:08 CEST markus.moritz
03. Jan 2019 00:12:06 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:59 CET Tobias Imported from Hamamatsu datasheet.