RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027856 - Archived data from Fri, 05. February 2021 11:10:52 CET


This is all the information about APD 2504027856. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027856
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 175
Position in Box: 18
EP1 batch: 16
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7063728 V     T = -25 °C: 346.2859997 V
Voltage for Gain 150: T = +20 °C: 388.5970083 V     T = -25 °C: 353.5221169 V
Voltage for Gain 200: T = +20 °C: 392.9911297 V     T = -25 °C: 357.5751161 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.390319618 V-1     T = -25 °C: 4.97599379 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.614319581 V-1     T = -25 °C: 9.621643706 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.28520429 V-1     T = -25 °C: 15.42655524 V-1
Break-through voltage: T = +20 °C: 404.8297959 V     T = -25 °C: 372.4423358 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:30:36 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:52 CET jreher Updated box and position via API.
11. Aug 2020 17:29:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:54 CET jreher Updated APD location via API.
25. Nov 2019 17:24:41 CET jreher Updated box and position via API.
03. Sep 2019 11:31:35 CEST jgrochowski Updated APD batch assignment via API.
18. Jul 2019 10:28:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:58 CEST jreher Updated APD location via API.
21. Jun 2019 15:50:45 CEST jgrochowski Updated APD batch assignment via API.
01. Apr 2019 11:32:57 CEST markus.moritz
03. Jan 2019 00:12:06 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:59 CET Tobias Imported from Hamamatsu datasheet.