RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027848 - Archived data from Fri, 05. February 2021 11:10:51 CET


This is all the information about APD 2504027848. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027848
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.1 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 175
Position in Box: 13
EP1 batch: 15
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.4673113 V     T = -25 °C: 343.9043869 V
Voltage for Gain 150: T = +20 °C: 385.3206001 V     T = -25 °C: 350.9660151 V
Voltage for Gain 200: T = +20 °C: 389.7118502 V     T = -25 °C: 354.9062676 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.581099587 V-1     T = -25 °C: 4.876074047 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.983641834 V-1     T = -25 °C: 10.49692181 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.12184801 V-1     T = -25 °C: 15.19248861 V-1
Break-through voltage: T = +20 °C: 405.5514517 V     T = -25 °C: 369.3993789 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:30:35 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:51 CET jreher Updated box and position via API.
11. Aug 2020 17:29:36 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:54 CET jreher Updated APD location via API.
25. Nov 2019 17:24:40 CET jreher Updated box and position via API.
18. Jul 2019 10:28:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:58 CEST jreher Updated APD location via API.
21. Jun 2019 15:54:23 CEST jgrochowski Updated APD batch assignment via API.
01. Apr 2019 11:48:15 CEST markus.moritz
03. Jan 2019 00:12:06 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:59 CET Tobias Imported from Hamamatsu datasheet.