Show Hamamatsu Avalanche Photo Diode 2504027832 - Archived data from Fri, 05. February 2021 11:10:49 CET


This is all the information about APD 2504027832. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027832
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.6 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 175
Position in Box: 2
EP1 batch: 15
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.7021785 V     T = -25 °C: 342.8468598 V
Voltage for Gain 150: T = +20 °C: 385.5072813 V     T = -25 °C: 350.1242387 V
Voltage for Gain 200: T = +20 °C: 389.849934 V     T = -25 °C: 354.2006945 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.48533976 V-1     T = -25 °C: 5.082117321 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.705811308 V-1     T = -25 °C: 9.717203392 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.41483165 V-1     T = -25 °C: 15.54989421 V-1
Break-through voltage: T = +20 °C: 405.8932575 V     T = -25 °C: 369.5344859 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:30:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:49 CET jreher Updated box and position via API.
11. Aug 2020 17:29:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:52 CET jreher Updated APD location via API.
25. Nov 2019 17:24:39 CET jreher Updated box and position via API.
15. Jul 2019 13:03:31 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:57 CEST jreher Updated APD location via API.
21. Jun 2019 15:54:22 CEST jgrochowski Updated APD batch assignment via API.
01. Apr 2019 13:06:10 CEST markus.moritz
03. Jan 2019 00:12:05 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:58 CET Tobias Imported from Hamamatsu datasheet.