RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027820 - Archived data from Fri, 05. February 2021 11:10:45 CET


This is all the information about APD 2504027820. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027820
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 174
Position in Box: 26
EP1 batch: 15
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Mar 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1609202 V     T = -25 °C: 344.8649021 V
Voltage for Gain 150: T = +20 °C: 387.9946021 V     T = -25 °C: 352.2014281 V
Voltage for Gain 200: T = +20 °C: 392.3594727 V     T = -25 °C: 356.3170633 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.600484984 V-1     T = -25 °C: 5.02478611 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.112509659 V-1     T = -25 °C: 9.483548378 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31064987 V-1     T = -25 °C: 15.20003003 V-1
Break-through voltage: T = +20 °C: 407.9498886 V     T = -25 °C: 371.2371144 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:15:43 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:30:49 CEST oafedulidis Updated box and position via API.
26. Apr 2021 15:22:59 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:45 CET jreher Updated box and position via API.
11. Aug 2020 17:29:30 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:44 CET jreher Updated APD location via API.
25. Nov 2019 17:24:37 CET jreher Updated box and position via API.
15. Jul 2019 13:03:30 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:51 CEST jreher Updated APD location via API.
21. Jun 2019 15:54:21 CEST jgrochowski Updated APD batch assignment via API.
02. Apr 2019 11:23:31 CEST markus.moritz
03. Jan 2019 00:12:05 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:58 CET Tobias Imported from Hamamatsu datasheet.