RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2503027741 - Archived data from Wed, 03. February 2021 18:21:37 CET


This is all the information about APD 2503027741. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2503027741
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2805031194/2503027741
Unit: #1598 (barcode 1309017010)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 60
Position in Box: 22
EP1 batch: 12
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.1651154 V     T = -25 °C: 349.3272726 V
Voltage for Gain 150: T = +20 °C: 393.000647 V     T = -25 °C: 356.7820838 V
Voltage for Gain 200: T = +20 °C: 397.3470154 V     T = -25 °C: 360.949857 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.598822985 V-1     T = -25 °C: 4.855913536 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.229032153 V-1     T = -25 °C: 9.842103032 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.43455638 V-1     T = -25 °C: 15.80500077 V-1
Break-through voltage: T = +20 °C: 412.5132595 V     T = -25 °C: 376.0581635 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:04 CET jreher Updated box and position via API.
03. Feb 2021 18:21:37 CET jreher Updated box and position via API.
08. Dec 2020 17:17:24 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:03 CEST jreher Updated box and position via API.
11. Aug 2020 17:29:18 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:21 CET jreher Updated APD location via API.
25. Nov 2019 17:15:37 CET jreher Updated box and position via API.
15. Jul 2019 13:03:00 CEST spankonin Updated APD batch assignment via API.
12. Jul 2019 13:55:29 CEST jreher Updated APD location via API.
21. Jun 2019 16:13:48 CEST spankonin Updated APD batch assignment via API.
02. Apr 2019 10:27:48 CEST markus.moritz
03. Jan 2019 00:12:02 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:57 CET Tobias Imported from Hamamatsu datasheet.