RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2503027731 - Archived data from Mon, 26. April 2021 15:22:10 CEST


This is all the information about APD 2503027731. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2503027731
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 60
Position in Box: 9
EP1 batch: 12
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9796894 V     T = -25 °C: 346.0379034 V
Voltage for Gain 150: T = +20 °C: 388.9872658 V     T = -25 °C: 353.4662992 V
Voltage for Gain 200: T = +20 °C: 393.4603442 V     T = -25 °C: 357.6531133 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.497710144 V-1     T = -25 °C: 5.08033744 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.002645978 V-1     T = -25 °C: 9.338120183 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.15474008 V-1     T = -25 °C: 14.69103101 V-1
Break-through voltage: T = +20 °C: 409.4151869 V     T = -25 °C: 373.072494 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:41:09 CET oafedulidis Assigned to capsule by script
03. May 2021 15:20:08 CEST oafedulidis Updated box and position via API.
26. Apr 2021 15:22:10 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:03 CET jreher Updated box and position via API.
03. Feb 2021 18:21:36 CET jreher Updated box and position via API.
11. Aug 2020 17:29:16 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:20 CET jreher Updated APD location via API.
25. Nov 2019 17:15:36 CET jreher Updated box and position via API.
15. Jul 2019 13:02:46 CEST spankonin Updated APD batch assignment via API.
12. Jul 2019 13:55:28 CEST jreher Updated APD location via API.
21. Jun 2019 16:13:47 CEST spankonin Updated APD batch assignment via API.
02. Apr 2019 10:44:06 CEST markus.moritz
03. Jan 2019 00:12:02 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:57 CET Tobias Imported from Hamamatsu datasheet.