RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027579 - Archived data from Mon, 17. August 2020 15:54:06 CEST


This is all the information about APD 2501027579. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027579
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.3 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 58
Position in Box: 8
EP1 batch: 9
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6957714 V     T = -25 °C: 344.3894601 V
Voltage for Gain 150: T = +20 °C: 387.5093357 V     T = -25 °C: 351.7289553 V
Voltage for Gain 200: T = +20 °C: 391.8582619 V     T = -25 °C: 355.8219789 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.464067146 V-1     T = -25 °C: 4.788135214 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.671247424 V-1     T = -25 °C: 10.05061634 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.18934617 V-1     T = -25 °C: 16.2572284 V-1
Break-through voltage: T = +20 °C: 407.4758843 V     T = -25 °C: 371.2756971 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:47 CET jreher Updated box and position via API.
03. Feb 2021 18:21:20 CET jreher Updated box and position via API.
07. Oct 2020 12:19:09 CEST jreher Assigned to capsule by script
17. Aug 2020 15:54:06 CEST jreher Updated box and position via API.
11. Aug 2020 17:28:58 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:57 CET jreher Updated APD location via API.
25. Nov 2019 17:15:26 CET jreher Updated box and position via API.
15. Jul 2019 13:02:05 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:04 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:40 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 14:05:06 CEST markus.moritz
03. Jan 2019 00:11:58 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.