RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2420027540 - Archived data from Mon, 16. May 2022 13:33:55 CEST


This is all the information about APD 2420027540. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2420027540
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 377.9 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 27
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.287958 V     T = -25 °C: 343.1625228 V
Voltage for Gain 150: T = +20 °C: 386.1008681 V     T = -25 °C: 350.517437 V
Voltage for Gain 200: T = +20 °C: 390.4611959 V     T = -25 °C: 354.6638642 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.499895633 V-1     T = -25 °C: 4.754213001 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.228556415 V-1     T = -25 °C: 9.102384456 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.63907144 V-1     T = -25 °C: 14.4862612 V-1
Break-through voltage: T = +20 °C: 406.0765251 V     T = -25 °C: 369.7302646 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 11:27:12 CET oafedulidis Assigned to capsule by script
16. May 2022 13:33:55 CEST oafedulidis Updated box and position via API.
28. Apr 2021 13:29:14 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:51:20 CET jreher Updated box and position via API.
03. Feb 2021 18:17:27 CET jreher Updated box and position via API.
11. Aug 2020 17:24:09 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:17 CET jreher Updated APD location via API.
25. Nov 2019 17:13:01 CET jreher Updated box and position via API.
04. Jul 2019 11:09:54 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:26 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:21 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 14:46:12 CET markus.moritz
03. Jan 2019 00:11:57 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.