RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2420027533 - Archived data from Wed, 03. February 2021 18:17:26 CET


This is all the information about APD 2420027533. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2420027533
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 27
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.7209288 V     T = -25 °C: 343.4473881 V
Voltage for Gain 150: T = +20 °C: 386.5809446 V     T = -25 °C: 350.8695791 V
Voltage for Gain 200: T = +20 °C: 390.9879849 V     T = -25 °C: 355.0455433 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.37875797 V-1     T = -25 °C: 4.681104314 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.903542071 V-1     T = -25 °C: 8.887063822 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.07243517 V-1     T = -25 °C: 16.12627399 V-1
Break-through voltage: T = +20 °C: 406.7045869 V     T = -25 °C: 370.2156729 V
   
Notes:


Version history

Time Author Change comment
05. May 2021 14:07:22 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:51:20 CET jreher Updated box and position via API.
03. Feb 2021 18:17:26 CET jreher Updated box and position via API.
11. Aug 2020 17:24:07 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:17 CET jreher Updated APD location via API.
25. Nov 2019 17:13:00 CET jreher Updated box and position via API.
04. Jul 2019 11:09:53 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:26 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:21 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 14:51:56 CET markus.moritz
03. Jan 2019 00:11:57 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:54 CET Tobias Imported from Hamamatsu datasheet.