RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2420027521 - Archived data from Wed, 03. February 2021 18:17:24 CET


This is all the information about APD 2420027521. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2420027521
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 374.9 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 27
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.8864036 V     T = -25 °C: 340.006105 V
Voltage for Gain 150: T = +20 °C: 382.6659513 V     T = -25 °C: 347.3064435 V
Voltage for Gain 200: T = +20 °C: 387.0229791 V     T = -25 °C: 351.4160332 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.607260975 V-1     T = -25 °C: 4.814135368 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.650246966 V-1     T = -25 °C: 9.305647833 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.4696414 V-1     T = -25 °C: 15.08875656 V-1
Break-through voltage: T = +20 °C: 402.9718691 V     T = -25 °C: 366.6702432 V
   
Notes:


Version history

Time Author Change comment
05. May 2021 14:07:22 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:51:18 CET jreher Updated box and position via API.
03. Feb 2021 18:17:24 CET jreher Updated box and position via API.
11. Aug 2020 17:24:05 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:16 CET jreher Updated APD location via API.
25. Nov 2019 17:13:00 CET jreher Updated box and position via API.
04. Jul 2019 11:09:52 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:20 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 11:51:01 CET markus.moritz
03. Jan 2019 00:11:56 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:54 CET Tobias Imported from Hamamatsu datasheet.