RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2420027514 - Archived data from Wed, 03. February 2021 18:17:23 CET


This is all the information about APD 2420027514. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2420027514
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2710030798/2420027514
Unit: #1672 (barcode 1309016792)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 27
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.9527112 V     T = -25 °C: 343.9191035 V
Voltage for Gain 150: T = +20 °C: 386.842307 V     T = -25 °C: 351.3134102 V
Voltage for Gain 200: T = +20 °C: 391.2002028 V     T = -25 °C: 355.417239 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.598649248 V-1     T = -25 °C: 4.835266951 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.441282792 V-1     T = -25 °C: 8.964264508 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.10990905 V-1     T = -25 °C: 14.09703766 V-1
Break-through voltage: T = +20 °C: 407.102266 V     T = -25 °C: 371.0497238 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:17 CET jreher Updated box and position via API.
03. Feb 2021 18:17:23 CET jreher Updated box and position via API.
29. Jan 2021 10:25:23 CET jreher Assigned to capsule by script
06. Oct 2020 16:50:46 CEST jreher Updated box and position via API.
11. Aug 2020 17:24:04 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:15 CET jreher Updated APD location via API.
25. Nov 2019 17:12:59 CET jreher Updated box and position via API.
04. Jul 2019 11:09:52 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:24 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:19 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:02:04 CET markus.moritz
03. Jan 2019 00:11:56 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:54 CET Tobias Imported from Hamamatsu datasheet.