RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2420027506 - Archived data from Tue, 06. October 2020 16:52:47 CEST


This is all the information about APD 2420027506. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2420027506
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 26
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.120965 V     T = -25 °C: 346.5228229 V
Voltage for Gain 150: T = +20 °C: 389.9299233 V     T = -25 °C: 353.8451752 V
Voltage for Gain 200: T = +20 °C: 394.2400341 V     T = -25 °C: 358.0030508 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.212310408 V-1     T = -25 °C: 4.804028196 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.743170064 V-1     T = -25 °C: 9.423857998 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.00250287 V-1     T = -25 °C: 15.88348118 V-1
Break-through voltage: T = +20 °C: 408.5323863 V     T = -25 °C: 372.2789106 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:14 CET jreher Updated box and position via API.
03. Feb 2021 18:17:20 CET jreher Updated box and position via API.
29. Jan 2021 10:23:32 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:47 CEST jreher Updated box and position via API.
11. Aug 2020 17:24:02 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:07 CET jreher Updated APD location via API.
25. Nov 2019 17:12:58 CET jreher Updated box and position via API.
04. Jul 2019 11:09:47 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:23 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:18 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:35:01 CET markus.moritz
03. Jan 2019 00:11:56 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:54 CET Tobias Imported from Hamamatsu datasheet.