RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027430 - Archived data from Wed, 03. February 2021 18:17:12 CET


This is all the information about APD 2419027430. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027430
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2420027506/2419027430
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.2 V
Dark current: 3.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 25
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.346249 V     T = -25 °C: 341.3960599 V
Voltage for Gain 150: T = +20 °C: 384.1685219 V     T = -25 °C: 348.7110286 V
Voltage for Gain 200: T = +20 °C: 388.4978282 V     T = -25 °C: 352.7647156 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.413291829 V-1     T = -25 °C: 5.028784218 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.667776803 V-1     T = -25 °C: 9.691237525 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.64214451 V-1     T = -25 °C: 14.85453359 V-1
Break-through voltage: T = +20 °C: 404.253072 V     T = -25 °C: 368.3114074 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:05 CET jreher Updated box and position via API.
03. Feb 2021 18:17:12 CET jreher Updated box and position via API.
29. Jan 2021 10:23:32 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:46 CEST jreher Updated box and position via API.
11. Aug 2020 17:23:51 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:56 CET jreher Updated APD location via API.
25. Nov 2019 17:12:52 CET jreher Updated box and position via API.
04. Jul 2019 11:09:38 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:18 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:13 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 13:00:38 CET markus.moritz
03. Jan 2019 00:11:54 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.