Show Hamamatsu Avalanche Photo Diode 2419027408 - Archived data from Wed, 03. February 2021 18:17:10 CET


This is all the information about APD 2419027408. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027408
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2401025902/2419027408
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 25
Position in Box: 25
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.248758 V     T = -25 °C: 344.2954524 V
Voltage for Gain 150: T = +20 °C: 387.9661081 V     T = -25 °C: 351.7236968 V
Voltage for Gain 200: T = +20 °C: 392.2752273 V     T = -25 °C: 355.8412474 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.763346109 V-1     T = -25 °C: 4.704581074 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.524978094 V-1     T = -25 °C: 10.46873431 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.95978488 V-1     T = -25 °C: 15.89495383 V-1
Break-through voltage: T = +20 °C: 407.2749371 V     T = -25 °C: 371.2275318 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:03 CET jreher Updated box and position via API.
03. Feb 2021 18:17:10 CET jreher Updated box and position via API.
11. Aug 2020 17:23:47 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:44 CEST jreher Assigned to capsule by script
13. Feb 2020 14:22:53 CET jreher Updated box and position via API.
27. Nov 2019 19:33:54 CET jreher Updated APD location via API.
25. Nov 2019 17:12:51 CET jreher Updated box and position via API.
04. Jul 2019 11:09:37 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:17 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:11 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:56:32 CET markus.moritz
03. Jan 2019 00:11:53 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.