RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027407 - Archived data from Mon, 17. August 2020 15:53:38 CEST


This is all the information about APD 2419027407. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027407
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 25
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0583244 V     T = -25 °C: 343.5256285 V
Voltage for Gain 150: T = +20 °C: 386.814499 V     T = -25 °C: 350.9051898 V
Voltage for Gain 200: T = +20 °C: 391.1685371 V     T = -25 °C: 355.0303845 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.404698709 V-1     T = -25 °C: 4.94679806 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.873638074 V-1     T = -25 °C: 9.631567414 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.74051875 V-1     T = -25 °C: 15.27978089 V-1
Break-through voltage: T = +20 °C: 407.0580704 V     T = -25 °C: 370.7080806 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:03 CET jreher Updated box and position via API.
03. Feb 2021 18:17:10 CET jreher Updated box and position via API.
07. Oct 2020 12:28:10 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:38 CEST jreher Updated box and position via API.
11. Aug 2020 17:23:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:54 CET jreher Updated APD location via API.
25. Nov 2019 17:12:51 CET jreher Updated box and position via API.
04. Jul 2019 11:09:37 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:17 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:11 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:58:42 CET markus.moritz
03. Jan 2019 00:11:53 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.