RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027405 - Archived data from Wed, 03. February 2021 18:17:10 CET


This is all the information about APD 2419027405. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027405
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 3.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 25
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.1791394 V     T = -25 °C: 343.1031396 V
Voltage for Gain 150: T = +20 °C: 386.0069674 V     T = -25 °C: 350.503497 V
Voltage for Gain 200: T = +20 °C: 390.3860086 V     T = -25 °C: 354.5827048 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.64922351 V-1     T = -25 °C: 4.761687384 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.311150041 V-1     T = -25 °C: 9.032577463 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.00051802 V-1     T = -25 °C: 16.03624517 V-1
Break-through voltage: T = +20 °C: 406.0733748 V     T = -25 °C: 369.8416142 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:02 CET jreher Updated box and position via API.
03. Feb 2021 18:17:10 CET jreher Updated box and position via API.
11. Aug 2020 17:23:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:54 CET jreher Updated APD location via API.
25. Nov 2019 17:12:51 CET jreher Updated box and position via API.
04. Jul 2019 11:09:37 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:16 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:11 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:44:13 CET markus.moritz
03. Jan 2019 00:11:53 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.