RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027401 - Archived data from Wed, 03. February 2021 18:17:09 CET


This is all the information about APD 2419027401. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027401
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2419027401/2302024307
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.5 V
Dark current: 2.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 25
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.0306612 V     T = -25 °C: 342.9207322 V
Voltage for Gain 150: T = +20 °C: 385.8514675 V     T = -25 °C: 350.2943514 V
Voltage for Gain 200: T = +20 °C: 390.2067107 V     T = -25 °C: 354.4299109 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.574905354 V-1     T = -25 °C: 4.828130161 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.536707627 V-1     T = -25 °C: 9.291413391 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.07489311 V-1     T = -25 °C: 14.91424433 V-1
Break-through voltage: T = +20 °C: 405.1362326 V     T = -25 °C: 368.8893248 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:02 CET jreher Updated box and position via API.
03. Feb 2021 18:17:09 CET jreher Updated box and position via API.
08. Dec 2020 17:07:02 CET jreher Assigned to capsule by script
17. Aug 2020 16:01:02 CEST vwerner Updated box and position via API.
11. Aug 2020 17:23:46 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:54 CET jreher Updated APD location via API.
25. Nov 2019 17:12:50 CET jreher Updated box and position via API.
04. Jul 2019 11:09:36 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:16 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:10 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 13:07:19 CET markus.moritz
28. Jan 2019 13:06:43 CET markus.moritz
03. Jan 2019 00:11:53 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.