RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2418027316 - Archived data from Tue, 11. August 2020 17:23:33 CEST


This is all the information about APD 2418027316. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2418027316
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2304024466/2418027316
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 24
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.625616 V     T = -25 °C: 344.3757873 V
Voltage for Gain 150: T = +20 °C: 387.4321323 V     T = -25 °C: 351.7247993 V
Voltage for Gain 200: T = +20 °C: 391.7965539 V     T = -25 °C: 355.8592285 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.649493459 V-1     T = -25 °C: 5.05322874 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.97090326 V-1     T = -25 °C: 9.233033101 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.33480355 V-1     T = -25 °C: 16.01865689 V-1
Break-through voltage: T = +20 °C: 406.9735724 V     T = -25 °C: 370.8726245 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:52 CET jreher Updated box and position via API.
03. Feb 2021 18:17:00 CET jreher Updated box and position via API.
11. Aug 2020 17:23:33 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:52:38 CEST jreher Assigned to capsule by script
13. Feb 2020 14:21:51 CET jreher Updated box and position via API.
27. Nov 2019 19:33:41 CET jreher Updated APD location via API.
25. Nov 2019 17:12:44 CET jreher Updated box and position via API.
04. Jul 2019 11:09:27 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:10 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:05 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:14 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 14:19:39 CET markus.moritz
03. Jan 2019 00:11:50 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:51 CET Tobias Imported from Hamamatsu datasheet.