RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2418027315 - Archived data from Fri, 05. February 2021 10:50:50 CET


This is all the information about APD 2418027315. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2418027315
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.9 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 23
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.1541185 V     T = -25 °C: 342.0192629 V
Voltage for Gain 150: T = +20 °C: 384.9463125 V     T = -25 °C: 349.3448919 V
Voltage for Gain 200: T = +20 °C: 389.3204407 V     T = -25 °C: 353.4801459 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.438298726 V-1     T = -25 °C: 4.783252986 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.231841101 V-1     T = -25 °C: 9.419170295 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.95717878 V-1     T = -25 °C: 16.19963314 V-1
Break-through voltage: T = +20 °C: 404.4326141 V     T = -25 °C: 368.4967406 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:28:02 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:50 CET jreher Updated box and position via API.
03. Feb 2021 18:16:58 CET jreher Updated box and position via API.
11. Aug 2020 17:23:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:34 CET jreher Updated APD location via API.
25. Nov 2019 17:12:43 CET jreher Updated box and position via API.
04. Jul 2019 11:09:22 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:10 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:14 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:29:27 CET markus.moritz
03. Jan 2019 00:11:50 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:51 CET Tobias Imported from Hamamatsu datasheet.