RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2417027300 - Archived data from Wed, 21. April 2021 11:02:57 CEST


This is all the information about APD 2417027300. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2417027300
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 23
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.7852209 V     T = -25 °C: 343.6368989 V
Voltage for Gain 150: T = +20 °C: 386.5861579 V     T = -25 °C: 351.0139746 V
Voltage for Gain 200: T = +20 °C: 390.9392763 V     T = -25 °C: 355.1497638 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.552472162 V-1     T = -25 °C: 4.913634679 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.803590646 V-1     T = -25 °C: 9.812182735 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.88275016 V-1     T = -25 °C: 15.17623494 V-1
Break-through voltage: T = +20 °C: 405.9209807 V     T = -25 °C: 370.0400569 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:30:12 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:57 CEST jreher Updated box and position via API.
05. Feb 2021 10:50:48 CET jreher Updated box and position via API.
03. Feb 2021 18:16:56 CET jreher Updated box and position via API.
11. Aug 2020 17:23:31 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:33 CET jreher Updated APD location via API.
25. Nov 2019 17:12:42 CET jreher Updated box and position via API.
04. Jul 2019 11:09:21 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:13 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:47:04 CET markus.moritz
03. Jan 2019 00:11:50 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:51 CET Tobias Imported from Hamamatsu datasheet.