RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2417027297 - Archived data from Wed, 03. February 2021 18:16:56 CET


This is all the information about APD 2417027297. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2417027297
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2417027297/2516028790
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 23
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.9932154 V     T = -25 °C: 343.6323984 V
Voltage for Gain 150: T = +20 °C: 386.7473081 V     T = -25 °C: 350.9937057 V
Voltage for Gain 200: T = +20 °C: 391.0682811 V     T = -25 °C: 355.1148051 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.529706429 V-1     T = -25 °C: 4.960648725 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.771667668 V-1     T = -25 °C: 9.034563224 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.93636907 V-1     T = -25 °C: 15.55030934 V-1
Break-through voltage: T = +20 °C: 405.9677472 V     T = -25 °C: 370.0813396 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:48 CET jreher Updated box and position via API.
03. Feb 2021 18:16:56 CET jreher Updated box and position via API.
11. Aug 2020 17:23:30 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:06:36 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:28 CET jreher Updated box and position via API.
27. Nov 2019 19:33:33 CET jreher Updated APD location via API.
25. Nov 2019 17:12:42 CET jreher Updated box and position via API.
04. Jul 2019 11:09:21 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:03 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:13 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:50:07 CET markus.moritz
03. Jan 2019 00:11:50 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:51 CET Tobias Imported from Hamamatsu datasheet.