RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2416027217 - Archived data from Wed, 03. February 2021 18:16:47 CET


This is all the information about APD 2416027217. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2416027217
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2405026272/2416027217
Unit: #858 (barcode 1309009411)
Preamp: 4538
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 22
Position in Box: 25
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2149615 V     T = -25 °C: 345.6716063 V
Voltage for Gain 150: T = +20 °C: 389.0226999 V     T = -25 °C: 353.0612355 V
Voltage for Gain 200: T = +20 °C: 393.3740101 V     T = -25 °C: 357.2116498 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.429045966 V-1     T = -25 °C: 4.88998543 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.297211173 V-1     T = -25 °C: 9.715179166 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.10830948 V-1     T = -25 °C: 15.03535968 V-1
Break-through voltage: T = +20 °C: 408.5716299 V     T = -25 °C: 372.3595034 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:38 CET jreher Updated box and position via API.
03. Feb 2021 18:16:47 CET jreher Updated box and position via API.
11. Aug 2020 17:23:18 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:51 CET jreher Updated box and position via API.
27. Nov 2019 19:33:21 CET jreher Updated APD location via API.
25. Nov 2019 17:12:37 CET jreher Updated box and position via API.
17. Oct 2019 14:06:18 CEST tholtmann Assigned to unit by script
17. Oct 2019 13:48:21 CEST tholtmann Assigned to capsule by script
04. Jul 2019 11:09:12 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:03 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:58 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:11:55 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:14:24 CET markus.moritz
25. Jan 2019 11:13:53 CET markus.moritz
03. Jan 2019 00:11:48 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:50 CET Tobias Imported from Hamamatsu datasheet.