RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2416027214 - Archived data from Wed, 03. February 2021 18:16:47 CET


This is all the information about APD 2416027214. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2416027214
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2416027214/2408026490
Unit: #847 (barcode 1309009305)
Preamp: 4576
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.2 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 22
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8855032 V     T = -25 °C: 347.2146679 V
Voltage for Gain 150: T = +20 °C: 390.701171 V     T = -25 °C: 354.6285392 V
Voltage for Gain 200: T = +20 °C: 395.0527529 V     T = -25 °C: 358.8081452 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.565493354 V-1     T = -25 °C: 4.705252693 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.842183129 V-1     T = -25 °C: 9.317566961 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.11453541 V-1     T = -25 °C: 16.25676411 V-1
Break-through voltage: T = +20 °C: 410.1145398 V     T = -25 °C: 373.8776511 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:38 CET jreher Updated box and position via API.
03. Feb 2021 18:16:47 CET jreher Updated box and position via API.
11. Aug 2020 17:23:18 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:39 CET jreher Updated box and position via API.
27. Nov 2019 19:33:21 CET jreher Updated APD location via API.
25. Nov 2019 17:12:37 CET jreher Updated box and position via API.
15. Jul 2019 15:50:12 CEST jreher Assigned to unit by script
15. Jul 2019 15:28:37 CEST jreher Assigned to capsule by script
04. Jul 2019 11:09:12 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:03 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:58 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:11:55 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:18:47 CET markus.moritz
03. Jan 2019 00:11:48 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:50 CET Tobias Imported from Hamamatsu datasheet.