RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027146 - Archived data from Wed, 03. February 2021 18:16:37 CET


This is all the information about APD 2415027146. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027146
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 377.8 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 21
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.0505887 V     T = -25 °C: 342.7821549 V
Voltage for Gain 150: T = +20 °C: 385.8575687 V     T = -25 °C: 350.1642611 V
Voltage for Gain 200: T = +20 °C: 390.2140012 V     T = -25 °C: 354.311859 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.479787838 V-1     T = -25 °C: 4.858892243 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.57281413 V-1     T = -25 °C: 9.665549893 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35894124 V-1     T = -25 °C: 14.87560963 V-1
Break-through voltage: T = +20 °C: 405.7175989 V     T = -25 °C: 369.4104498 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:29 CET jreher Updated box and position via API.
03. Feb 2021 18:16:37 CET jreher Updated box and position via API.
11. Aug 2020 17:23:06 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:09 CET jreher Updated APD location via API.
25. Nov 2019 17:12:31 CET jreher Updated box and position via API.
04. Jul 2019 11:09:02 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:57 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:18 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 14:10:00 CET markus.moritz
03. Jan 2019 00:11:45 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:49 CET Tobias Imported from Hamamatsu datasheet.