RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027134 - Archived data from Wed, 03. February 2021 18:16:34 CET


This is all the information about APD 2415027134. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027134
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2405026318/2415027134
Unit: #856 (barcode 1309009398)
Preamp: 4519
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 20
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7780899 V     T = -25 °C: 346.4158606 V
Voltage for Gain 150: T = +20 °C: 389.6338245 V     T = -25 °C: 353.8154858 V
Voltage for Gain 200: T = +20 °C: 393.9676408 V     T = -25 °C: 357.9679395 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.283512144 V-1     T = -25 °C: 4.504660747 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.656653316 V-1     T = -25 °C: 9.602695102 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.93885643 V-1     T = -25 °C: 14.87130194 V-1
Break-through voltage: T = +20 °C: 409.3474943 V     T = -25 °C: 373.2144475 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:25 CET jreher Updated box and position via API.
03. Feb 2021 18:16:34 CET jreher Updated box and position via API.
11. Aug 2020 17:23:03 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:51 CET jreher Updated box and position via API.
27. Nov 2019 19:33:00 CET jreher Updated APD location via API.
25. Nov 2019 17:12:29 CET jreher Updated box and position via API.
17. Oct 2019 14:04:41 CEST tholtmann Assigned to unit by script
17. Oct 2019 13:45:11 CEST tholtmann Assigned to capsule by script
04. Jul 2019 11:08:57 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:56 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:51 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:11 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 10:49:34 CET markus.moritz
03. Jan 2019 00:11:45 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:49 CET Tobias Imported from Hamamatsu datasheet.