RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027109 - Archived data from Fri, 05. February 2021 10:50:22 CET


This is all the information about APD 2415027109. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027109
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 20
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6690559 V     T = -25 °C: 347.3327118 V
Voltage for Gain 150: T = +20 °C: 390.4795191 V     T = -25 °C: 354.7482538 V
Voltage for Gain 200: T = +20 °C: 394.8319837 V     T = -25 °C: 358.9089443 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.574409493 V-1     T = -25 °C: 4.958347021 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.786575193 V-1     T = -25 °C: 8.956381222 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.76164675 V-1     T = -25 °C: 15.24858063 V-1
Break-through voltage: T = +20 °C: 409.0122919 V     T = -25 °C: 373.1665445 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:35:55 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:01:29 CEST jreher Updated box and position via API.
05. Feb 2021 10:50:22 CET jreher Updated box and position via API.
03. Feb 2021 18:16:31 CET jreher Updated box and position via API.
11. Aug 2020 17:22:58 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:59 CET jreher Updated APD location via API.
25. Nov 2019 17:12:27 CET jreher Updated box and position via API.
04. Jul 2019 11:08:55 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:48 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:01 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.