RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027101 - Archived data from Wed, 03. February 2021 18:16:30 CET


This is all the information about APD 2415027101. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027101
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2415027101/0718006710
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 20
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6331073 V     T = -25 °C: 347.1068523 V
Voltage for Gain 150: T = +20 °C: 390.4003413 V     T = -25 °C: 354.496653 V
Voltage for Gain 200: T = +20 °C: 394.727984 V     T = -25 °C: 358.6603522 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.638794783 V-1     T = -25 °C: 4.714155245 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.050299424 V-1     T = -25 °C: 9.344821941 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.42477578 V-1     T = -25 °C: 16.18148307 V-1
Break-through voltage: T = +20 °C: 409.6009476 V     T = -25 °C: 373.5232101 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:21 CET jreher Updated box and position via API.
03. Feb 2021 18:16:30 CET jreher Updated box and position via API.
11. Aug 2020 17:22:57 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:47:29 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:20 CET jreher Updated box and position via API.
27. Nov 2019 19:32:58 CET jreher Updated APD location via API.
25. Nov 2019 17:12:26 CET jreher Updated box and position via API.
04. Jul 2019 11:08:54 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:48 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:01 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.