RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027089 - Archived data from Tue, 11. August 2020 17:22:56 CEST


This is all the information about APD 2414027089. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027089
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2414027089/2502027661
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 20
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.2611175 V     T = -25 °C: 344.7949985 V
Voltage for Gain 150: T = +20 °C: 388.0254748 V     T = -25 °C: 352.139487 V
Voltage for Gain 200: T = +20 °C: 392.3630649 V     T = -25 °C: 356.2590383 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.769372229 V-1     T = -25 °C: 4.87331855 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.270509701 V-1     T = -25 °C: 9.73008548 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.15131752 V-1     T = -25 °C: 14.96848138 V-1
Break-through voltage: T = +20 °C: 407.8184519 V     T = -25 °C: 371.4018777 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:21 CET jreher Updated box and position via API.
03. Feb 2021 18:16:30 CET jreher Updated box and position via API.
11. Aug 2020 17:22:56 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:51:52 CEST jreher Assigned to capsule by script
13. Feb 2020 14:19:57 CET jreher Updated box and position via API.
27. Nov 2019 19:32:58 CET jreher Updated APD location via API.
25. Nov 2019 17:12:26 CET jreher Updated box and position via API.
04. Jul 2019 11:08:54 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:48 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:01 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.