RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027086 - Archived data from Wed, 03. February 2021 18:16:29 CET


This is all the information about APD 2414027086. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027086
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2708030635/2414027086
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 20
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6453434 V     T = -25 °C: 346.9072824 V
Voltage for Gain 150: T = +20 °C: 390.4565773 V     T = -25 °C: 354.2913278 V
Voltage for Gain 200: T = +20 °C: 394.8078954 V     T = -25 °C: 358.4519744 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.593093884 V-1     T = -25 °C: 4.781487958 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.896709155 V-1     T = -25 °C: 9.496712826 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.07480469 V-1     T = -25 °C: 14.59160179 V-1
Break-through voltage: T = +20 °C: 409.9567874 V     T = -25 °C: 373.3529184 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:20 CET jreher Updated box and position via API.
03. Feb 2021 18:16:29 CET jreher Updated box and position via API.
11. Aug 2020 17:22:56 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:45:21 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:19 CET jreher Updated box and position via API.
27. Nov 2019 19:32:57 CET jreher Updated APD location via API.
25. Nov 2019 17:12:26 CET jreher Updated box and position via API.
04. Jul 2019 11:08:54 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.