RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027084 - Archived data from Fri, 05. February 2021 10:50:20 CET


This is all the information about APD 2414027084. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027084
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 20
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9225159 V     T = -25 °C: 344.7639609 V
Voltage for Gain 150: T = +20 °C: 387.6673167 V     T = -25 °C: 352.089061 V
Voltage for Gain 200: T = +20 °C: 391.9878365 V     T = -25 °C: 356.1896671 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.627372585 V-1     T = -25 °C: 4.981880077 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.120667859 V-1     T = -25 °C: 9.198580636 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.03603258 V-1     T = -25 °C: 16.24244441 V-1
Break-through voltage: T = +20 °C: 407.4499834 V     T = -25 °C: 371.2774712 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:03 CEST jreher Updated box and position via API.
14. Apr 2021 18:13:32 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 10:50:20 CET jreher Updated box and position via API.
03. Feb 2021 18:16:29 CET jreher Updated box and position via API.
11. Aug 2020 17:22:55 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:57 CET jreher Updated APD location via API.
25. Nov 2019 17:12:26 CET jreher Updated box and position via API.
04. Jul 2019 11:08:54 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.