RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027079 - Archived data from Tue, 11. August 2020 17:22:54 CEST


This is all the information about APD 2414027079. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027079
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 19
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.243719 V     T = -25 °C: 346.6428353 V
Voltage for Gain 150: T = +20 °C: 390.036276 V     T = -25 °C: 354.0493298 V
Voltage for Gain 200: T = +20 °C: 394.3751714 V     T = -25 °C: 358.2020302 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.429793515 V-1     T = -25 °C: 4.896295335 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.347950814 V-1     T = -25 °C: 9.802827028 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.2733297 V-1     T = -25 °C: 15.20383243 V-1
Break-through voltage: T = +20 °C: 409.3892961 V     T = -25 °C: 373.0786725 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:17 CET jreher Updated box and position via API.
03. Feb 2021 18:16:27 CET jreher Updated box and position via API.
29. Jan 2021 10:25:32 CET jreher Assigned to capsule by script
06. Oct 2020 16:50:48 CEST jreher Updated box and position via API.
11. Aug 2020 17:22:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:50 CET jreher Updated APD location via API.
25. Nov 2019 17:12:25 CET jreher Updated box and position via API.
04. Jul 2019 11:08:49 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.