RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027071 - Archived data from Tue, 08. December 2020 17:09:30 CET


This is all the information about APD 2414027071. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027071
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2309024895/2414027071
Unit: #1561 (barcode 1309016648)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.4 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 19
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.2831056 V     T = -25 °C: 349.4035778 V
Voltage for Gain 150: T = +20 °C: 393.0770985 V     T = -25 °C: 356.8324149 V
Voltage for Gain 200: T = +20 °C: 397.4005545 V     T = -25 °C: 360.9990105 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.42703136 V-1     T = -25 °C: 4.981363712 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.379350848 V-1     T = -25 °C: 9.069707706 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.39299353 V-1     T = -25 °C: 15.66055648 V-1
Break-through voltage: T = +20 °C: 412.0120972 V     T = -25 °C: 375.554593 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:16 CET jreher Updated box and position via API.
03. Feb 2021 18:16:26 CET jreher Updated box and position via API.
08. Dec 2020 17:09:30 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:38 CEST jreher Updated box and position via API.
11. Aug 2020 17:22:53 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:49 CET jreher Updated APD location via API.
25. Nov 2019 17:12:24 CET jreher Updated box and position via API.
04. Jul 2019 11:08:48 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:59 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:46:44 CET markus.moritz
03. Jan 2019 00:11:43 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.