RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027030 - Archived data from Tue, 11. August 2020 17:22:45 CEST


This is all the information about APD 2414027030. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027030
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.4 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 19
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.407285 V     T = -25 °C: 353.2860521 V
Voltage for Gain 150: T = +20 °C: 397.2510324 V     T = -25 °C: 360.8574198 V
Voltage for Gain 200: T = +20 °C: 401.6241739 V     T = -25 °C: 365.1055281 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.6771987 V-1     T = -25 °C: 4.577958053 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.114578643 V-1     T = -25 °C: 8.855309109 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88403298 V-1     T = -25 °C: 15.0312854 V-1
Break-through voltage: T = +20 °C: 416.3334924 V     T = -25 °C: 380.1991179 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:23:36 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:29:51 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:11 CET jreher Updated box and position via API.
03. Feb 2021 18:16:21 CET jreher Updated box and position via API.
11. Aug 2020 17:22:45 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:46 CET jreher Updated APD location via API.
25. Nov 2019 17:12:21 CET jreher Updated box and position via API.
04. Jul 2019 11:08:45 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:42 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:35 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 14:20:22 CET markus.moritz
25. Jan 2019 12:45:41 CET markus.moritz
25. Jan 2019 12:45:15 CET markus.moritz
03. Jan 2019 00:11:42 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:47 CET Tobias Imported from Hamamatsu datasheet.