RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027026 - Archived data from Wed, 03. February 2021 18:16:18 CET


This is all the information about APD 2414027026. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027026
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2802030968/2414027026
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 18
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9153454 V     T = -25 °C: 345.2340702 V
Voltage for Gain 150: T = +20 °C: 388.7236293 V     T = -25 °C: 352.6009248 V
Voltage for Gain 200: T = +20 °C: 393.072743 V     T = -25 °C: 356.745257 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.520216119 V-1     T = -25 °C: 4.699094073 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.663946672 V-1     T = -25 °C: 9.241641237 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.50552992 V-1     T = -25 °C: 15.83480624 V-1
Break-through voltage: T = +20 °C: 408.2869493 V     T = -25 °C: 371.7492002 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:09 CET jreher Updated box and position via API.
03. Feb 2021 18:16:18 CET jreher Updated box and position via API.
11. Aug 2020 17:22:44 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:52:21 CEST jreher Assigned to capsule by script
13. Feb 2020 13:37:21 CET jreher Updated box and position via API.
27. Nov 2019 19:32:39 CET jreher Updated APD location via API.
25. Nov 2019 17:12:20 CET jreher Updated box and position via API.
04. Jul 2019 11:08:41 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:42 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:34 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 11:58:47 CET markus.moritz
03. Jan 2019 00:11:42 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:47 CET Tobias Imported from Hamamatsu datasheet.