RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027021 - Archived data from Thu, 03. January 2019 00:11:41 CET


This is all the information about APD 2414027021. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027021
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 18
Position in Box: 25
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
07. Feb 2022 10:46:03 CET oafedulidis Assigned to capsule by script
17. May 2021 09:17:32 CEST oafedulidis Updated box and position via API.
26. Apr 2021 15:21:43 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:08 CET jreher Updated box and position via API.
03. Feb 2021 18:16:18 CET jreher Updated box and position via API.
11. Aug 2020 17:22:44 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:38 CET jreher Updated APD location via API.
25. Nov 2019 17:12:20 CET jreher Updated box and position via API.
04. Jul 2019 11:08:40 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:42 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:34 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:07:59 CET markus.moritz
03. Jan 2019 00:11:41 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:47 CET Tobias Imported from Hamamatsu datasheet.