RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413027001 - Archived data from Wed, 03. February 2021 18:16:17 CET


This is all the information about APD 2413027001. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413027001
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2515028656/2413027001
Unit: #1364 (barcode 1309014026)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 18
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.586497 V     T = -25 °C: 346.8809827 V
Voltage for Gain 150: T = +20 °C: 390.4453518 V     T = -25 °C: 354.330825 V
Voltage for Gain 200: T = +20 °C: 394.84156 V     T = -25 °C: 358.523403 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.63711559 V-1     T = -25 °C: 4.822543857 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.994633432 V-1     T = -25 °C: 9.573195642 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.31200776 V-1     T = -25 °C: 14.75500488 V-1
Break-through voltage: T = +20 °C: 410.1964833 V     T = -25 °C: 373.828636 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:07 CET jreher Updated box and position via API.
03. Feb 2021 18:16:17 CET jreher Updated box and position via API.
07. Oct 2020 12:16:30 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:14 CEST jreher Updated box and position via API.
11. Aug 2020 17:22:42 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:32:25 CET jreher Updated box and position via API.
27. Nov 2019 19:32:38 CET jreher Updated APD location via API.
25. Nov 2019 17:12:19 CET jreher Updated box and position via API.
04. Jul 2019 11:08:40 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:46 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:34 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 11:56:32 CET markus.moritz
03. Jan 2019 00:11:41 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:47 CET Tobias Imported from Hamamatsu datasheet.