RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026968 - Archived data from Wed, 03. February 2021 18:16:13 CET


This is all the information about APD 2413026968. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026968
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2418027339/2413026968
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.5 V
Dark current: 9.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 18
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.8523808 V     T = -25 °C: 349.1165952 V
Voltage for Gain 150: T = +20 °C: 392.69239 V     T = -25 °C: 356.539711 V
Voltage for Gain 200: T = +20 °C: 397.0452132 V     T = -25 °C: 360.6808007 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.630323381 V-1     T = -25 °C: 4.888204133 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.373268092 V-1     T = -25 °C: 9.684029925 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.72773094 V-1     T = -25 °C: 15.76487952 V-1
Break-through voltage: T = +20 °C: 412.4202784 V     T = -25 °C: 375.8232248 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:04 CET jreher Updated box and position via API.
03. Feb 2021 18:16:13 CET jreher Updated box and position via API.
11. Aug 2020 17:22:36 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:14:28 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:42 CET jreher Updated box and position via API.
27. Nov 2019 19:32:35 CET jreher Updated APD location via API.
25. Nov 2019 17:12:17 CET jreher Updated box and position via API.
04. Jul 2019 11:08:37 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:24 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:09:41 CET markus.moritz
03. Jan 2019 00:11:40 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.