RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2413026942 - Archived data from Wed, 21. April 2021 11:02:47 CEST


This is all the information about APD 2413026942. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026942
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.5 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 28
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.36314 V     T = -25 °C: 350.5185179 V
Voltage for Gain 150: T = +20 °C: 394.2259432 V     T = -25 °C: 358.0078712 V
Voltage for Gain 200: T = +20 °C: 398.599528 V     T = -25 °C: 362.1896017 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.690928167 V-1     T = -25 °C: 4.904746138 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.16805028 V-1     T = -25 °C: 8.89730633 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.98514598 V-1     T = -25 °C: 15.20552471 V-1
Break-through voltage: T = +20 °C: 412.6439375 V     T = -25 °C: 376.2958581 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 16:12:00 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:47 CEST jreher Updated box and position via API.
05. Feb 2021 10:51:27 CET jreher Updated box and position via API.
03. Feb 2021 18:17:34 CET jreher Updated box and position via API.
11. Aug 2020 17:24:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:28 CET jreher Updated APD location via API.
25. Nov 2019 17:13:05 CET jreher Updated box and position via API.
04. Jul 2019 11:10:01 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:25 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:39 CET Tobias Corrected dark current unit.
26. Nov 2018 13:04:27 CET markus.moritz
16. Nov 2018 15:05:09 CET markus.moritz
12. Jan 2018 13:11:46 CET Tobias Imported from Hamamatsu datasheet.