Show Hamamatsu Avalanche Photo Diode 2413026933 - Archived data from Tue, 11. August 2020 17:24:15 CEST


This is all the information about APD 2413026933. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2413026933
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.4 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 28
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.0076081 V     T = -25 °C: 352.1716895 V
Voltage for Gain 150: T = +20 °C: 395.9149905 V     T = -25 °C: 359.7651098 V
Voltage for Gain 200: T = +20 °C: 400.3604417 V     T = -25 °C: 364.0062425 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.523781579 V-1     T = -25 °C: 4.828087142 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.625615551 V-1     T = -25 °C: 9.347125194 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.4108535 V-1     T = -25 °C: 15.07720163 V-1
Break-through voltage: T = +20 °C: 415.3632248 V     T = -25 °C: 379.1822271 V
   
Notes:


Version history

Time Author Change comment
27. Aug 2021 10:30:26 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:51:26 CET jreher Updated box and position via API.
03. Feb 2021 18:17:33 CET jreher Updated box and position via API.
11. Aug 2020 17:24:15 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:27 CET jreher Updated APD location via API.
25. Nov 2019 17:13:04 CET jreher Updated box and position via API.
04. Jul 2019 11:10:01 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:29 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:24 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:39 CET Tobias Corrected dark current unit.
26. Nov 2018 13:15:45 CET markus.moritz
16. Nov 2018 15:07:57 CET markus.moritz
12. Jan 2018 13:11:45 CET Tobias Imported from Hamamatsu datasheet.