RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026886 - Archived data from Tue, 11. August 2020 17:22:32 CEST


This is all the information about APD 2412026886. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026886
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 17
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8389001 V     T = -25 °C: 348.1101812 V
Voltage for Gain 150: T = +20 °C: 391.670753 V     T = -25 °C: 355.5339939 V
Voltage for Gain 200: T = +20 °C: 396.0253788 V     T = -25 °C: 359.7151551 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.533582828 V-1     T = -25 °C: 4.710038202 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.681677987 V-1     T = -25 °C: 9.215425151 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.60596722 V-1     T = -25 °C: 15.79590799 V-1
Break-through voltage: T = +20 °C: 411.1956571 V     T = -25 °C: 374.6174134 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:59 CET jreher Updated box and position via API.
03. Feb 2021 18:16:09 CET jreher Updated box and position via API.
11. Aug 2020 17:22:32 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:26 CET jreher Updated APD location via API.
25. Nov 2019 17:12:14 CET jreher Updated box and position via API.
04. Jul 2019 11:08:31 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:37 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:16 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:38 CET Tobias Corrected dark current unit.
26. Nov 2018 13:20:22 CET markus.moritz
16. Nov 2018 12:09:04 CET markus.moritz
12. Jan 2018 13:11:45 CET Tobias Imported from Hamamatsu datasheet.