RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026880 - Archived data from Fri, 05. February 2021 10:49:58 CET


This is all the information about APD 2412026880. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026880
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.5 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 17
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8961578 V     T = -25 °C: 348.2290051 V
Voltage for Gain 150: T = +20 °C: 391.744632 V     T = -25 °C: 355.667783 V
Voltage for Gain 200: T = +20 °C: 396.1201879 V     T = -25 °C: 359.8462522 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.525403229 V-1     T = -25 °C: 4.680025708 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.679387121 V-1     T = -25 °C: 9.152142415 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.57860785 V-1     T = -25 °C: 15.7578919 V-1
Break-through voltage: T = +20 °C: 411.7195823 V     T = -25 °C: 375.1142855 V
   
Notes: foam


Version history

Time Author Change comment
10. Jun 2022 12:21:02 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:15:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:49:58 CET jreher Updated box and position via API.
03. Feb 2021 18:16:08 CET jreher Updated box and position via API.
11. Aug 2020 17:22:31 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:26 CET jreher Updated APD location via API.
25. Nov 2019 17:12:14 CET jreher Updated box and position via API.
04. Jul 2019 11:08:31 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:15 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:38 CET Tobias Corrected dark current unit.
26. Nov 2018 13:14:21 CET markus.moritz
16. Nov 2018 12:11:26 CET markus.moritz
12. Jan 2018 13:11:45 CET Tobias Imported from Hamamatsu datasheet.