RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026844 - Archived data from Wed, 03. February 2021 18:16:06 CET


This is all the information about APD 2412026844. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026844
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 17
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0861453 V     T = -25 °C: 347.5845802 V
Voltage for Gain 150: T = +20 °C: 391.0358884 V     T = -25 °C: 355.1081497 V
Voltage for Gain 200: T = +20 °C: 395.4958361 V     T = -25 °C: 359.3613673 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.379226575 V-1     T = -25 °C: 4.793113433 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.002929873 V-1     T = -25 °C: 9.411340152 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.98943457 V-1     T = -25 °C: 14.24760574 V-1
Break-through voltage: T = +20 °C: 411.3549179 V     T = -25 °C: 375.124729 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:56 CET jreher Updated box and position via API.
03. Feb 2021 18:16:06 CET jreher Updated box and position via API.
11. Aug 2020 17:22:28 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:25 CET jreher Updated APD location via API.
25. Nov 2019 17:12:12 CET jreher Updated box and position via API.
04. Jul 2019 11:08:30 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:35 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:09 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:37 CET Tobias Corrected dark current unit.
26. Nov 2018 12:33:22 CET markus.moritz
16. Nov 2018 12:18:10 CET markus.moritz
12. Jan 2018 13:11:44 CET Tobias Imported from Hamamatsu datasheet.